CMP have just completed a 450m Chilled Water pipe work changeout in the Pilbara. The client requested the removal of previously installed copper pipe in place of Kembla’s KemPress Stainless Steel System. Our technicians were able to remove the existing pipe work and install the new pipe work in only 12 days due to the Crimp Connection system utilised on the KemPress Product. A Hydro Test was orignally completed off site with pressures holding for 24 hours at 1000 kPA. The far exceeds the on site requirement of 400kPA. The client is excstatic with the quality and time CMP were able to turnover the project with minimal impact to the rest of the Plant Construction.